From underground heat to power for digital infrastructure.
Advanced Geothermal Systems collect heat below ground. The RePG pathway combines a sealed subsurface circuit with a surface power module that converts part of that heat into electricity.
Explore how the system works, how it can support data centers and what distinguishes it from conventional geothermal generation.
Engineering and equipment assembly at our Main Global Engineering Center in Bursa. Photograph from the visit on 6 October 2026.Explore the Bursa center
01 / HOW GEOTHERMAL AGS WORKS
Two separate circuits. A continuous transfer of heat.
AGS describes the subsurface heat collection system. ORC, the Organic Rankine Cycle, describes the surface process that converts thermal energy into electrical energy. In the sealed RePG concept, a heat exchanger connects these two systems without mixing their fluids.
Conceptual illustration of the two circuits. Equipment arrangement and well geometry are illustrative and are not a construction drawing.
A / BELOW GROUND
The geothermal circuit
Heat moves from the rock into a fluid contained inside the well loop. This architecture is designed to avoid producing formation water to the surface.
B / AT THE SURFACE
The conversion circuit
An organic working fluid receives the heat, drives a generator through an expansion stage, condenses and circulates again.
C / ENERGY BALANCE
Useful power and remaining heat
Only part of the thermal input becomes electricity. Cooling rejects the remaining heat, while circulation pumps and other auxiliaries consume part of the generated power.
Closed-loop geothermal generationConceptual · not to scale
Swipe to explore the diagram
01
Collect heat underground
A heat-transfer fluid circulates inside sealed pipework. Heat passes from the surrounding rock through the pipe wall; the circuit does not rely on producing formation fluid.
02
Transfer heat, keep fluids separate
At the surface, the heat exchanger transfers thermal energy to a separate Organic Rankine Cycle working fluid, which evaporates at the designed operating conditions.
03
Generate electricity
The ORC vapour expands through a turbine coupled to a generator. Useful net output is the electrical generation remaining after pumps, cooling and other plant loads.
04
Condense and circulate again
A cooling system removes residual heat. The ORC fluid condenses and is pumped back to the evaporator, while the geothermal fluid returns underground in its own circuit.
Simplified functional arrangement, not a construction drawing. Well geometry, working fluids, heat exchangers, cooling and net electrical performance are designed for each site's measured conditions.
01
Collect heat underground
A fluid circulates inside a sealed well loop. Heat passes from the surrounding rock through the pipe wall into this fluid, which returns to the surface.
02
Transfer heat at the surface
An exchanger transfers the collected heat to a separate organic working fluid. The geothermal fluid and the ORC fluid stay in their own circuits.
03
Generate electricity
In the Organic Rankine Cycle, the heated working fluid vaporises and expands through an expander or turbine connected to an electrical generator.
04
Condense and circulate again
A condenser releases the remaining heat to a cooling system. A pump returns the organic fluid to the exchanger, while the geothermal fluid returns underground.
02 / GEOTHERMAL AGS FOR DATA CENTERS
Powering computation. Managing heat as a resource.
Data centers need continuous electricity for servers, networking, storage and cooling. An AGS installation can be designed to contribute to that electrical demand by using underground heat as its energy source. A second, separate opportunity is to recover suitable heat already leaving the servers.
PATH A / GEOTHERMAL GENERATION
Bring energy into the campus
The subsurface circuit supplies heat to an ORC module. Its net electrical output feeds the campus distribution system alongside the other power supplies. The proportion of campus demand it can cover depends on the geothermal resource, system size and measured operating performance.
PATH B / SERVER HEAT RECOVERY
Recover part of the outgoing heat
A suitable warm liquid cooling circuit can transfer heat through an isolated exchanger to a dedicated recovery module. This option needs sufficient temperature and flow, plus a colder heat sink. It recovers a fraction of waste energy and is assessed separately from underground generation.
Geothermal AGS for data centresConceptual · not to scale
Swipe to explore the diagram
01
Supply from a geothermal resource
An independently assessed geothermal plant can contribute electricity to the site's electrical distribution. Its output depends on the resource and the complete plant energy balance.
02
Capture suitable server heat
Where liquid cooling provides suitable temperature and flow, an isolation heat exchanger can transfer server heat to a separate recovery circuit without mixing the cooling fluids.
03
Evaluate additional recovery
An optional recovery module can contribute electricity only where a validated temperature difference and net energy balance support it. Direct heat use is an alternative where a compatible demand exists.
04
Retain resilient power and cooling
Grid supply, UPS, backup power and designed cooling capacity remain part of the data centre infrastructure. Unrecovered heat still has to be rejected or used by a separate heat demand.
Illustrative integration architecture, not a promise of autonomous operation. Server heat is a by-product of energy already consumed. Recovering part of it cannot create a self-powering data centre.
Cooling remains an essential system
Warm server coolant, sometimes designed around 55–70°C in the company’s scenarios, is different from ordinary low temperature chilled water. A heat recovery module must match the actual cooling technology and must not compromise server inlet conditions.
Residual heat still needs to be rejected. Bypasses and an independent cooling path allow the data center to operate when a recovery unit is unavailable. Direct use of the heat in a nearby building or process should also be compared with electrical conversion.
From concept to a working data center installation
01
Define the electrical load
Measure the IT load, cooling demand, auxiliary services and hourly operating profile. Size the geothermal contribution against the campus’s real demand and resilience requirements.
02
Qualify the heat sources
Characterise underground temperature and sustainable heat extraction. Separately measure the temperature, flow and availability of any server cooling loop proposed for heat recovery.
03
Engineer the interfaces
Use isolated heat exchangers, dedicated controls and bypasses. Integrate the generator with the campus electrical system, protection equipment and energy management controls.
04
Validate the complete balance
Test net electrical output, pumping power, cooling duties and seasonal performance. Retain heat rejection capacity, grid connections, UPS and backup arrangements required by the facility.
The same surface conversion principle can also recover suitable industrial process heat or use an existing geothermal stream. These applications have different heat sources and do not, by themselves, demonstrate an integrated sealed AGS field.
Conventional hydrothermal generation brings naturally occurring hot fluid to the surface. The sealed AGS concept circulates its own fluid inside underground pipes and collects heat through their walls. The distinction is how heat is obtained, rather than the use of ORC alone.
Two different ways to access underground heatConceptual · not to scale
Swipe to explore the diagram
01
Conventional hydrothermal
Geothermal fluid is produced from a naturally permeable reservoir. Heat is used at the surface and fluid is typically reinjected. Reservoir flow, fluid chemistry and resource management are central design considerations.
02
Sealed closed-loop concept
A separate heat-transfer fluid remains inside engineered pipes. Heat crosses the rock and pipe wall by conduction. Heat-transfer area, thermal conductivity, circulation losses and the long-term temperature response remain decisive.
This compares conventional hydrothermal extraction with a sealed closed-loop concept. It does not represent every geothermal technology: enhanced geothermal systems are a separate category. Both approaches require geological, technical, environmental and economic assessment; neither has a universal depth or zero-risk guarantee.
Conventional hydrothermal and the sealed RePG AGS concept
Design question
Conventional geothermal
Sealed AGS concept
Heat collection
Hot water or steam is produced from a natural geothermal reservoir, usually with reinjection after use.
A circulating fluid collects heat through the walls of sealed underground pipes.
Reservoir requirements
Power production depends on suitable heat, fluid availability and reservoir permeability.
The sealed concept does not require production flow through a naturally permeable reservoir. Rock temperature and heat transfer remain decisive.
Fluid and rock contact
Produced geothermal fluid has been in contact with the formation; its chemistry must be managed.
The circulating fluid stays inside the sealed well circuit. Well integrity and material durability must be verified.
Power conversion
Steam or binary power cycles can be used, depending on resource conditions. Binary plants can also use ORC.
The RePG pathway couples sealed heat collection with a separate surface ORC power block.
Depth and output
Resource temperature, geology and reservoir performance determine well design and output.
Depth, well geometry, temperature, thermal drawdown and pumping losses determine the practical design. There is no universal depth or output.
Development and validation
Conventional hydrothermal power has an established operating history, with performance specific to each field.
RePG reports operating evidence for the surface conversion platform; its integrated subsurface AGS pathway has a separate pilot and qualification programme.
04 / ENGINEERING & FIELD EVIDENCE
The operating evidence. The next validation steps.
The documented Hayat Kimya and AFJET installations provide evidence for the surface conversion platform under two different thermal regimes. The integrated subsurface AGS system has a separate development pathway.
COMPANY REPORTED MATURITYTRL 9
Surface ORC power block
Factory built equipment with documented operating records at the Hayat Kimya and AFJET installations, including monitoring and control systems.
COMPANY REPORTED MATURITYTRL 7
Integrated subsurface AGS
A separate qualification and pilot pathway addressing subsurface integration, real environment performance and subsequent scale up.
INDUSTRIAL HEAT RECOVERY
Hayat Kimya
Installed capacity
75 kWe
Mean net output
48.4 kW
Availability
97.5%
Operating period
4,248 h
Net generation
205.5 MWh
Figures from the nine page field report for July 2024 to January 2025. Later host interface maintenance and the reported return to service are recorded separately.
EXISTING GEOTHERMAL CIRCUIT
AFJET
Installed capacity
15 kWe
Measured net output
12.7 kW
Inlet / return temperature
72 / 66°C
Source flow
25 m³/h
Thermal input
175 kWt
The documented unit uses an existing permitted geothermal reinjection circuit. No new well was drilled for this installation.
Equipment assembly and engineering work in Bursa.Power equipment, pipework and control systems. Original visit photographs, 6 October 2026.
View further manufacturing photographs
05 / EUROPEAN AGS PILOT PROJECT
Augusto Innovation Hub. Milazzo, Sicily.
R. Rockefeller S.C. is developing its first European AGS geothermal pilot project for Augusto Innovation Hub, with RePG as its industrial and technological partner.
The pilot is intended to test how geothermal energy can support the planned campus’s data center infrastructure and continuous energy needs. It connects the geothermal programme with the Hub’s activities in Super Intelligence, cybersecurity and digital infrastructure.
Augusto Innovation Hub, the proposed European pilot context.
06 / CERTIFICATIONS & COMPLIANCE
Documentation with a defined scope.
The certification file separates management systems, engineering test reports and the RE-75 kW product attestation. Each document applies to its stated scope and is distinct from qualification of a complete integrated AGS installation.
Five documents cover the engineering center, AGS technology, data center applications, certification scopes and operating evidence. The current 56 page Centre & Research Lab presentation is included below.
CENTRE & RESEARCH LAB
RRSC / RePG Global Engineering & Research Centre
Explore our main global engineering centre in Bursa, its research laboratory, geothermal AGS technologies, data centre energy systems, industrial heat recovery and international pilot projects.